Once Do-Ron takes on a project, it is involved from the initial concept stage through to run-in, with as much follow-up customer support as it takes. First, the process is carefully defined and a protocol submitted for customer approval, forming the basis for the next stages of the project. Do-Ron’s strategy focuses on demanding strictest precision in the earliest stages, to ensure a solid foundation for an outcome that is fit-for-purpose, workable and economical.
The initial process engineering stage includes:
- Process definition and conceptual design
- Equipment design & specification
- Material / Energy balancing
- Control strategy design and process instrument data specification
- Specification of sequences of operation
- Environmental surveys and feasibility studies
- Detail design
- Design per FDA requirements / plant validation documents
- Commissioning and startup services
- Operator training