G.G. Do-ron Projects LTD
  • Home
  • Profile
  • Services
  • Projects
  • Contact us
  • EnglishEnglish
    • עבריתעברית
  • Home
  • profile-compeny
  • Services
  • Projects
  • Contact us
  • עבריתעברית
G.G. Do-ron Projects LTD
  • Home
  • Profile
  • Services
  • Projects
  • Contact us
  • EnglishEnglish
    • עבריתעברית
  • Home
  • profile-compeny
  • Services
  • Projects
  • Contact us
  • עבריתעברית
Home Article of: admin (Page 2)

Article of: admin

Laboratories design

Lab design from the ground up, Do-Ron’s have more the 10 years of experience in laboratories design. Our service include:

October 18, 2016 10:07 am Comments Off on Laboratories design admin Read More »

Instrumentation & Control

Based on the entire instrument in the project, this stage involves: Preparation of instrumentation lists Instrumentation specifications Analysis of bids

October 18, 2016 10:06 am Comments Off on Instrumentation & Control admin Read More »

HVAC systems

From basis of design to validation, our company do HVAC specification for laboratories, clean rooms, offices and warehouses. Our services

October 18, 2016 10:04 am Comments Off on HVAC systems admin Read More »

Cleanroom design

Whit over then 15 years of experience in cleanroom design and construction, from basis of design to validation. Our company

October 18, 2016 9:11 am Comments Off on Cleanroom design admin Read More »

Civil Engineering

From basis of design to supervision, our company can do both side supervision and constriction. Our services include the following:

October 18, 2016 9:09 am Comments Off on Civil Engineering admin Read More »

Suite sterile – Teva Kfar Saba

Natural plant Kfar Saba Construction of a new sterile suite structure existing laboratories Managing and supervising the construction of a

October 5, 2016 12:52 pm Comments Off on Suite sterile – Teva Kfar Saba admin Read More »

Teva Kfar Saba – RTO system

Purchase and installation of the system RTO company DURR Management and supervision of an extensive project of replacing an old

October 5, 2016 12:52 pm Comments Off on Teva Kfar Saba – RTO system admin Read More »

Makhteshim factory Beersheba – Structure Laboratory

Makhteshim plant in Be’er Sheva Construction of new laboratories 3-storey building, construction of a unique R & D labs to

October 5, 2016 12:52 pm Comments Off on Makhteshim factory Beersheba – Structure Laboratory admin Read More »

Makhteshim – installing electric barrels

Makhteshim factory in Be’er Sheva – installing electric barrels Stoves preparing specifications according to customer requirements, purchasing of equipment installation

October 5, 2016 12:52 pm Comments Off on Makhteshim – installing electric barrels admin Read More »

Muffy Parma – clean piping works

Muffy Pharma Ramat Hovav Project management and monitoring drug manufacturing plant Making clean piping, process piping, cooling water piping, assembling

October 5, 2016 12:52 pm Comments Off on Muffy Parma – clean piping works admin Read More »
  • 1
  • 2
  • 3
Who we are
לורם איפסום דולור סיט אמט, קונסקטורר אדיפיסינג אלית קולהע צופעט למרקוח איבן איף, ברומץ כלרשט מיחוצים. קלאצי קונסקטורר אדיפיסינג אלית. סת אלמנקום ניסי נון ניבאה. דס איאקוליס וולופטה דיאם. וסטיבולום אט דולור, קראס אגת לקטוס וואל אאוגו וסטיבולום סוליסי טידום בעליק. קונדימנטום קורוס בליקרה, נונסטי קלובר בריקנה סטום, לפריקך תצטריק לרטי.
את זה נבנה ע"י ליבר יזמות
Scroll to top
Skip to content